Owner | Contractor | Project name | Range of works | Class |
Projects finished 2000 - 2001 | ||||
Various owners | Gdynia Shipyard S.A. | Ship’s hulls: 8229/2, 8229/1, 8185/2, 81185/1, 8184/3, 8198/4,8168/3, 8200/1, 8200/2, 8138/12, 8229/2 | Construction of sections and blocks | DNV, GL |
ULSTAIN, SIMEC Norway | MARITIM | Hull blocks | Various blocks construction | DNV |
Projects finished in 2004 | ||||
LOTOS GROUP Poland | LOTOS PALIWA | Floating Petrol Station | Construction of whole vessel | PRS |
Miasto Płock Poland | Mosty Łódź-Mosty Płock – Mostostal Płock | Highway bridge over Vistula river | Construction of bridge stringers | I.B.D.IM. National Institute of Road and Brige Construction |
BATEAUX PARISIEN France | CHANTIEURS DE LA HAUTE_SEINE Villeneuve-le-roi | River cruiser (bateau mouche) | Construction and mounting of roof for vessel | BV |
CFT France | SOCARENAM France | Pushboats | Construction of series of pushboats (4 pcs.) | BV |
Projects finished 2005 | ||||
Marine Administration France | HYDROLAND France | Dredger | Construction of hull | BV |
CFT France | SOCARENAM France | Pushboats | Construction of a series of pushboats (2 pcs.) | BV |
Naval Harbour in Gdynia, Poland | ENERGOPOL | Port wharf | The prefabrication of walls of the port wharf | |
WIZÓW Poland | SGL Acotec Poland | Chemical reservoirs | Construction of 2 reservoirs for phosphor acid | U.D.T. Office of Technical Inspection |
Denmark shipowner | Skipapol | Extension of trawlers | Lengthening and broadening of 2 hulls | DNV |
Projects finished 2006 | ||||
HEGOY AS HOVDEN AS Norway | Larsnes Norway | Trawler 28 m | Construction of 2 hulls for fishing vessels with aluminium forecast and masts | DNV |
Herman Sr. B.V | DAMEN Hardinxveld Holland | Multicat 26 m, 11 m wide | Construction of a hull of tug/pusher/multi-purpose vessel | BV |
Projects finished 2007 | ||||
Damen Marine Services | DAMEN Hardinxveld Holland | Shoalbuster 30 m, 9 m wide | Construction of the hull of tug/ pusher | BV |
Opportunus Fishing Co Ltd | KARSTENSEN Denmark | Trawler 19,95 m | Construction of the hull of trawler | DNV |
Delta Marine | DAMEN Hardinxveld Holland | Multicat 26 m, 11 m wide | Construction of a hull of tug/pusher/multi-purpose vessel | BV |
HOVDEN AS Norway | Larsnes Norway | Trawler 28 m | Construction of the hull of fishing vessels with aluminium forecast and masts | DNV |
Projects finished 2008 | ||||
Lunar Harvest | KARSTENSEN Denmark | Trawler 28 m | Construction of 2 hulls of trawlers | DNV |
Aktau International Sea Commercial Port, Kazakstan | DAMEN Gorinchem Holland | Stan Tug 19 m, 7 m wide | Construction of 2 hulls of ice tug boats | LRS |
DAMEN Hardinxveld Holland | Pushbuster 35 m, 11 m wide | Construction of 4 hulls of tugs | BV | |
Niels Kjærsgaard and John Kjærsgaard | KARSTENSEN Denmark | Trawler 39,95 m | Construction of hull of trawler | DNV |
Projects finished 2009 | ||||
Damen Marine Services | DAMEN Hardinxveld Holland | Pushbuster 35 m, 11 m wide | Construction of 2 hulls of a tug/ pusher | BV |
Port of Vejle, Denmark | DAMEN Gorinchem Holland | Stan Tug 19 m, 7 m wide | Construction of the hull of a tug boat | LRS |
Marine Craft Services Ltd. | DAMEN Hardinxveld Holland | Multicat 26 m, 11 m wide | Construction of a hull of tug/pusher/multi-purpose vessel | BV |
ST Marine Support | DAMEN Hardinxveld Holland | Multicat 30 m, 13 m wide | Construction of a hull of tug/pusher/multi-purpose vessel | BV |
Vieger & Son Tugboat | DAMEN Hardinxveld Holland | Shoalbuster 36 m, 12 m wide | Construction of hull of tug/ pusher | BV |
Projects finished 2010 | ||||
Polska Żegluga Morska | Etmal | Odra | Repair – a part of the keel shellplating exchanged, plating in peak ballast tanks and engineroom exchanged | DNV |
Forland | Kodal Shipyard S.A. | catamaran Tellefisk | Finishing from the steel hull state into the turn-key vessel for the salmon farms on Northsea | NMD |
Projects finished 2011 | ||||
Erfjord Stamfisk | Erfjord Stamfisk Norway | workboat Stamfisk | Turn-key boat for salmon farms on Northsea | NMD |
J. Garvik | J. Garvik AS Norway | trimaran Tørris | Turn-key boat for salmon farms on Northsea | NMD |
Research Fishing Co. Ltd. | DAMEN Hardinxveld Holland | Multicat 26 m, 11 m wide | Construction of a hull of tug/pusher/multi-purpose vessel | BV |
Van Oord | DAMEN Hardinxveld Holland | Multicat 32 m, 13 wide | Construction of a hull of tug/pusher/multi-purpose vessel | BV |
Delta Marine | DAMEN Hardinxveld Holland | Multicat 26 m, 13 m wide | Construction of a hull of tug/pusher/multi-purpose vessel | BV |
DAMEN Hardinxveld Holland | Multicat 26 m, 11 m wide | Construction of a hull of tug/pusher/multi-purpose vessel | BV | |
Ownward Fishing Ltd. | Alkor sp. z o.o. | Norma Mary | Prefabrication of steel construction – insert in the midship with a weight around 220 tons | DNV |
Projects finished 2012 | ||||
DAMEN Hardinxveld Holland | Multicat 26 m, 11 m wide | Construction of 2 hulls of tug/pusher/multi-purpose vessel | BV | |
DAMEN Hardinxveld Holland | Multicat 30 m, 13 m wide | Construction of 2 hulls of tug/pusher/multi-purpose vessel | BV | |
DAMEN Hardinxveld Holland | Pushbuster 30 m, 9 m wide | Construction of hull of tug/ pusher | BV | |
DAMEN Hardinxveld Holland | Multicat 26 m, 13 m wide | Construction of a hull of tug/pusher/multi-purpose vessel | BV | |
Van Oord | SIETAS Shipyard Germany | M/S Aleous, YN 1221 | Block 19 (Section 1400 and 1430) - Construction of the bow bottom part with the bulb bow and two thrusters, altogether approx. 260 tons of steel construction | DNV |
Projects finished 2013 | ||||
DAMEN Hardinxveld Holland | Multicat 32 m, 13 m wide | Construction of a hull of tug/pusher/multi-purpose vessel | BV | |
DAMEN Hardinxveld Holland | Multicat 26 m, 11 m wide | Construction of a hull of tug/pusher/multi-purpose vessel | BV | |
SAMBA AS | DAMEN Hardinxveld Holland | Multicat 26 m, 11 m wide | Construction of a hull of tug/pusher/multi-purpose vessel | BV |
DAMEN Hardinxveld Holland | Shoalbuster 33 m, 12 m wide, ice class | Construction of hull of tug/ pusher | BV | |
Projects finished 2014 | ||||
Kotug | DAMEN Hardinxveld Holland | Rotor Tug 32 m, 12 m wide | Construction of 2 turn-key hybrid-drive tugs | LR |
Serco | DAMEN Hardinxveld Holland | Multicat 32 m, 13 m wide | Construction of a hull of tug/pusher/multi-purpose vessel | LR |
Herman Sr. BV | DAMEN Hardinxveld Holland | Shoalbuster 27 m, 13 m wide | Construction of hull of tug/ pusher | BV |
Piriou, France | B2M C318 - military unit | Construction of 5 hull blocks and cutting, bending and flat prefabrication of 7 blocks (together above 700 tons and 4 tons of piping) | BV | |
Projects finished 2015 | ||||
DAMEN Hardinxveld Holland | Multicat 27 m x 11,5 m | Construction of hull of tug/pusher/multi-purpose vessel | BV | |
DAMEN Hardinxveld Holland | Multicat 27 m x 11,5 m | Construction of hull of tug/pusher/multi-purpose vessel | BV | |
DAMEN Hardinxveld Holland | Multicat 36,66 m x 12,5 m | Construction of hull of tug/pusher/multi-purpose vessel | BV | |
DAMEN Hardinxveld Holland | Shoalbuster 34,75 m x 12,48 m | Construction of hull of tug/pusher/multi-purpose vessel | BV | |
Projects finished 2016 | ||||
DAMEN Hardinxveld Holland | Multicat 27,27 m, x 11,5 m | Construction of hull of tug/pusher/multi-purpose vessel | BV | |
DAMEN Hardinxveld Holland | Shoalbuster 27 m, x 10,5 m | Construction of hull of tug/pusher/multi-purpose vessel | BV | |
Simek AS, Norway | Blocks and sections of hull | DNV | ||
DAMEN Hardinxveld Holland | RSV 33,18 m x 14,5 m | Construction of hull of tug/pusher/multi-purpose vessel | BV | |
DAMEN Hardinxveld Holland | Rotor Tug 32 m x 13 m | Construction of tug | LR | |
DAMEN Hardinxveld Holland | Shoalbuster 34,745 m, x 12,48 m | Construction of hull of tug/pusher/multi-purpose vessel | BV | |
Projects finished 2017 | ||||
DAMEN Hardinxveld Holland | ASD 22,73 m x 10,43 m | Construction of hull of tug/pusher/multi-purpose vessel | BV | |
Piriou, France | Blocks and sections of 2 hulls | BV | ||
Larsnes Norway | Trawler 38,65 m x 9,25 m | Construction of hull of tug/pusher/multi-purpose vessel | DNV | |
DAMEN Hardinxveld Holland | WID 25,7 m x 15,44 m | Construction of hull of tug/pusher/multi-purpose vessel | BV | |
Projects finished 2018 | ||||
DAMEN Hardinxveld Holland | Multicat 27,27 m x 11,5 m | Construction of hull of tug/pusher/multi-purpose vessel | BV | |
Stadyard Norway | Trawler 39,7 m x 9,8 m | Construction of the hull of fishing vessels with aluminium forecast and masts | DNV | |
Stadyard Norway | Trawler 39,7 m x 9,8 m | Construction of the hull of fishing vessels with aluminium forecast and masts | DNV | |
Projects finished 2019 | ||||
Fitjar AS, Norway | Trawler 49,7 m x 11 m | Construction of hull of fishing vessel | DNV | |
DAMEN Hardinxveld Holland | Multicat 34,65 m x 15,58 m | Construction of hull of tug/pusher/multi-purpose vessel | BV | |
Maaskant, Holland | Trawler 32 m x 9,6 m | Construction of hull of fishing vessel | LR | |
DAMEN Hardinxveld Holland | RSV 33,18 m x 14,5 m | Construction of hull of tug/pusher/multi-purpose vessel | BV | |
Maaskant, Holland | Trawler 32 m x 9,6 m | Construction of hull of fishing vessel | BV | |
Maaskant, Holland | Trawler 32 m x 9,6 m | Construction of hull of fishing vessel | BV | |
Granli Fiskeri AS, Norway | Trawler 27,97 m x 10 m | Construction of hull of fishing vessel | DNV |
Anti-corrosion department
INVESTOR | DIRECT EMPLOYER | TYPES OF OBJECT WHERE SERVICES WERE PERFORMED | TYPES OF PAINTS AND SURFACES OF APPLIED COATINGS | NOTES |
MARINE INDUSTRY – ANTICORROSION | ||||
DANYARD DANMARK | MOSTOSTAL GDAŃSK SA | 6 superstructures (1730, 1731, 1732, 1733, 1734 , 1735) weight 600t and cubage each and shipdeck equipment elements (weight 1.500t together) | INTERNATIONAL PAINT | superstructure: |
200.000 m2 | - 5 outer paint coatings | |||
- 3 inner paint coatings | ||||
open range condition | ||||
shipdeck equipment | ||||
ORSKOV DANMARK | MOSTOSTAL GDAŃSK SA | 2 superstructures (203, 204) weight | SIGMA | superstructure: |
2 x 88 t | 2 x 3.000 m2 | - 1 outer paint coating | ||
- 1 inner paint coating | ||||
open range condition | ||||
Mc GREGOR | LABOR GDAŃSK | 8 hatch covers | HEMPEL | 1 paint coating topside and 3 paint coatings bottom side hatch cover |
2.600 m2 | inside hall | |||
MAC COR | „RADUNIA” SHIPYARD GDAŃSK | 21 hatch covers | INTERNATIONAL PAINT | 2 paint coating |
GERMANY | 11.350 m2 | open range conditions | ||
HDW SHIPYARD KIEL/GERMANY | NAVAL SHIPYARD | superstructure | SIGMA | 5 paint coatings |
GDYNIA | NB - 325 | 2.300 m2 | open range conditions | |
DAMEN | „RADUNIA” SHIPYARD | 4 tow boats | INTERNATIONAL PAINT | 2 outer and inner paint coatings |
HOLLAND | GDAŃSK | (400m2 each) | 1.600 m2 | open range conditions |
SHIPYARD | NAVAL SHIPYARD | ballast tanks, chemical cargo tanks NS503,NS504 | SIGMA | 3 paint coatings |
NORWAY | GDYNIA | 10.200 m2 | open range conditions | |
KVAERNER | MOSTOSTAL | sponson | JOTUN | 2 paint coatings |
NORWAY | GDAŃSK | 7.000 m2 | open range conditions | |
USA | MUHLHAN | cargo tanks „SENTINEL” | INTERNATIONAL | 2 paint coatings |
GDAŃSK | PAINT | |||
4.760 m2 | ||||
NORWAY | SHIPYARD CENAL GDAŃSK | Ships: | HEMPEL | 2 paint coatings |
Sorcon, ORN KE | 5.000 m2 | open range conditions | ||
fjord ferry | ||||
AKTRO NORWAY | MOSTOSTAL GDAŃSK | crane 51 t | INTERNATIONAL | 5 paint coatings |
PAINT | open range conditions | |||
820 m2 | ||||
SMT HOLAND | MOSTOSTAL | Crane for „ANTWERPEN” | HEMPEL | |
GDAŃSK | 735 m2 | |||
SOBRENA YARD/FRANCE | GRUPPE PEINIGER | Ballast tanks on „Hassi R’mel” | 10.000 m2 | |
GDYNIA SHIPYARD | GDAŃSKA SHIPYARD | Sections of ships | INTERNATIONAL | |
B 203/1, B203/2, B203/3, B203/4, B 203/5, B 203/6, B203/7, B203/8 | approx. | |||
160.000 m2 | ||||
PEAB/FJERBY AS | MOSTSOTAL | Ramps for bridge | HEMPEL – | 3 coatings |
GDAŃSK | Antiskid coating – 2.000 m2 | |||
SAFEGRIP – | ||||
350 m2 | ||||
NORWEGIA | MOSTOSTAL | ramp | JOTUN | 150 um Dunois |
GDAŃSK | SAFEGRIP | SAFEGRIP | ||
3 coats of Jotun | ||||
GERMANY | GRUPPE PEINIGER | Ballast tanks, cargo tanks | HEMPEL | 100 um zinc |
app. 9.000 m2 | ||||
NORTHERN SHIPYARD/ TERMIKA | Parts of holds, tanks, board | Metallizing | ||
App. 650 m2 | ||||
SKANSKA STALTEKNIK | SAFE | Ramp in Trelleborg | SAFEGRIP | |
1.800 m2 | ||||
GDAŃSK SHIPREPAIR YARD | INVWEST REM | Deck ( for vehicles ) on ferry POVL ANKER | HP washing, free dust blast cleaning, painting | |
about 2.100 m2 | ||||
GDYNIA | SHIPYARD | Sections, tanks, cargo, superstructures | HEMPEL, OLIVA, CARBOLINE, INTERNATIONAL | 2, 3 coats |
SHIPYARD | ||||
CRIST | Sections, tanks, cargo, superstructures | HEMPEL, CARBOLINE, INTERNATIONAL | 2, 3 coats | |
OFFSHORE – ANTICORROSION | ||||
UMOE | MOSTOSTAL | superstructures of boring tower 1920 t | JOTUN | 3 paint coatings |
NORWAY | GDAŃSK | TROLL C | HUMMERVOLL 28.000 m2 | open range conditions |
KVAERNER | MOSTOSTAL | superstructures of boring tower 485 t | JOTUN | 2 paint coatings |
ROSENBERG | GDAŃSK | JOTUN | HUMMERVOLL | open range conditions |
NORWAY | 5.800 m2 | |||
KVAERNER | MOSTOSTAL | superstructures of boring tower 3940 t | JOTUN | 2 paint coatings |
ROSENBERG | GDAŃSK | ASGARD B | HUMMERVOLL | 200um metallization |
NORWAY | 51.000 m2 | Hummervoll system | ||
AKER STORD | MOSTOSTAL | Drilling tower | CARBOLINE | 2coats + 200um metallization aluminium |
NORWAY | GDAŃSK | Osberg SOR 1153t | HUMMERVOLL | |
18.000 m2 | ||||
NORWAY | REMONTOWA SHIPREPAIR YARD | Offshore construction | HEMPEL | 3 coats |
510 m2 | ||||
ABB OFFSHORE SYSTEMS NORWEY | MOSTOSTAL | KVITEBJORN drilling tower | Carboline, Hummervoll | |
GDAŃSK | ca. 34.000 m2 | |||
ABB OFFSHORE SYSTEMS NORWAY | MOSTOSTAL GDAŃSK | Flare Boom | 2.000 m2 | Metallization AlMg5 |
AKER/KVAERNER/STORD AS | MOSTOSTAL POMORZE | H-6e Drilling Rig Alfa Beta | NORSOK 1, 2F, 4R, 4T, 8 | |
NORWAY | 24.000 m2 | |||
BLADT IDUSTRIES | MOSTOSTAL POMORZE | Deck equipment oil platform East and West Robin Rig | 5200m2 | NORSOK 1,2,4 5200m2 |
DENMARK | ||||
AIBEL AS | MOSTOSTAL POMORZE | Sleipner B commpression modul | 7.000 m2 | NORSOK 2A, 2B, 4R, |
NORWAY | 4D, 1P, 5T | |||
AKER | MOSTOSTAL POMORZE | Goja | 18.000 m2 | NORSOK 1H, 5A, 4A, 4D, 4R, 3B |
KVAERNER | 2008/2009 | |||
BLADT IDUSTRIES | MOSTOSTAL POMORZE | Sheringham | 10.000 m2 | NORSOK 1, 2, 2A, 3, 3A, 5, 8, 9 |
DENMARK | 2010 | |||
BLADT IDUSTRIES | MOSTOSTAL POMORZE | Anholt | 6.000 m2 | NORSOK A1, A4, 8, 7, A100-A.6 |
DENMARK | 2011 | |||
POWER, CHEMICAL ENGINEERING – ANTICORROSION | ||||
FLS MILJO/POWER PLANT VOCKOW | MOSTOSTAL | flue gas desulphurization installation | HEMPEL | Technology – FLS MILJO |
GDAŃSK | 4.600 m2 | |||
POWER STATION | KCT KIELCE | Flue gas desulphurization installation | KCH | 2 paint coatings |
POŁANIEC | 8.000 m2 | open range conditions | ||
POWER STATION | FLS MILJO A/S | Limestone slurry tank | SIGMA | 3 paint coatings |
POŁANIEC | 150 m2 | open range conditions | ||
POWER STATION | HAW GERMANY | flue gas desulphurization installation | HAW | 1 coat |
BEŁCHATÓW | 7.650 m2 | |||
POWER STATION ŁAZISKA | KCT KIELCE | flue gas desulphurization installation | KCH | 2 coats |
7.700 m2 | ||||
ENERGETIC COMPANY SŁUPSK | WATER POWER STATION SŁUPSK | Water power station in Strzegomino | SIKA | Injection to concrete |
VANTSFELL/ ISLANDIA | MOSTOSTAL | Pipes for water Power Plant | HEMPEL | 3.700 m2 were metallized ( 120 um Zn ) |
GDAŃSK | 7.000 m2 | |||
GZNF FOSFORY | KCH/KCT | Funnel | KORROPLAST 2 mm | |
400 m2 | ||||
ABB ZAMECH | ENERGOMONTAŻ- PÓŁNOC | Gas pipeline | Drying of instalation 1.200 m2 | |
Jamał-Western Europe | ||||
ABB ZAMECH | GAZOBUDOWA ZABRZE | Gas pipeline | Drying of instalation | |
Jamał-Western Europe | 400 m2 | |||
GERMANY | T.W.ENG | Flue gas instalation | CEILCOTE | |
4.500 m2 | ||||
UK | SGL Carbon Group | Flue gas installation | CEILCOTE | |
West Barton | 5.000 m2 | |||
FINLAND | SGL Carbon Group | Flue gas installation | CEILCOTE | |
Naantali | 5.000 m2 | |||
UK | SGL Acotec Ltd | Flue gas installation | CEILCOTE | |
Eggborough | 11.000 m2 | |||
UK | SGL Acotec Ltd | Flue gas installation | Coroflake | |
Drax | 4.200 m2 | |||
UK | TW Eng | Flue gas installation | Coroflake | |
Ferrybridge | 23.800 m2 | |||
BRIDGE ENGINEERING – ANTICORROSION | ||||
PPRM PŁOCK | MOSTOSTAL | The bridge on A1 road | SIKA | 2 coats + |
GDAŃSK | 504 m2 | 150 um zinc | ||
PPRM PŁOCK | PRODMOREX | The bridge in Elbląg | SIKA | 2 coats + |
10.000 m2 | 150 um zinc | |||
MOSTOBUDOWA GDAŃSK | STALBET PROJEKT | Pipeline, the bridge on the river Omaza | POLIFARB OLIVA | 4 coats + |
300 m2 | 150 um zinc | |||
CIVIL ENGINEERING – ANTICORROSION | ||||
„PE BE” BERLIN GERMANY | „PE BE” GDAŃSK | sports hall’s contruction – SIERKSDORF / BDR | KANSAI | 2 paint coatings |
sports hall’s construction - USLAR / BDR | 6.800 m2 | 3 paint coatings | ||
3.000 m2 | inside hall | |||
HALL HIT GDYNIA | BUDIMEX POZNAŃ | Metallization and paint equipments | Polifarb Oliva | 100um metallization |
865 m2 | 2 paint coatings | |||
WESTWAY | PORT GDYNIA | Molasses terminal | Repair works | |
POLAND | ||||
PORT GDAŃSK | MOSTOSTAL GDAŃSK | Grain silos | HEMPEL | 2 coatings |
1.260 m2 | ||||
ODENSE/ | MOSTOSTAL GDAŃSK/MARINE METAL | “GOLIATH”GATE CRANE | HEMPEL | |
MANKRAFT | 50.000 m2 | |||
MOSTOSTAL GDAŃSK | CARREFOUR | SIGMA | ||
Shop center – steel construction | 5.000 m2 | |||
GDAŃSKA SHIPYARD | MOSTOSTAL GDAŃSK | Steel construction - hall | HEMPEL | |
10.000 m2 |
Foreign departments
CLIENT | TYPES OF OBJECT WHERE THE SERVICES WERE PERFORMED | NATURE OF WORKS | NOTES certificates D.N.V., G.L. or B.V. |
CHANTIERS PIRIOU Concarneau | Trawlers, merchant ships | Fitting of blocks and hulls welding | Years 1999, 2000, 2003, 2008 B.V. |
F.C.R.N. Concarneau | Trawlers, Specials vessels | Repair and renovations of ships | Years 1999, 2000, 2003 |
OCEA-MAG FRANCE Fontenay-le-Comte | Trawlers, Specials vessels, Pontoons and catways Cruisers Millennium | Montage and aluminium hulls welding with their accessories; aluminium construction of pontoons for yacht port; montage and aluminium superstructure welding for Cruisers. | Year 2000 B.V. B.V. L.R. |
OCEA Les Sables D’Olonne | Trawlers, Specials vessels | Repair and ships renovations, montage and aluminium hulls welding with their accessories | Year 2000 B.V. |
OCEA TRANSPORT St.Nazaire | Cruisers: Millennium S31, T31, C 32 and D32 P&O | Assembly and aluminium superstructure welding with accessories divers for Cruisers | Years 2000, 2001, 2002 L.R. |
METALU St.Brevin le Pin | Cruisers and their accessories en aluminium | Fitting and sections of aluminium welding with accessories divers for great cruisers | Years 1999, 2000 L.R. |
MECASOUD St.Nazaire | Cruisers Millennium | Montage and sections welding | Years 1999, 2000 L.R. |
CHANTIERS ACHERES Acheres | Floating dock for river ships | Montage and hull welding of new floating dock, reparation and renovations of ships | Year 2001 B.V. |
SOCARENAM Boulogne sur mer MENUISERIE NAVALE LEFEVRE Etaples P.I.D.M. Wimereux | Tugs for air craft carrier GCDG – “Esterel” et “Luberon”, others tugs, Ocean buoy tender “Armorique” (Brest) et “Haut De France” (Dunkerque), NSG vessels, MSV75 vessels Trawlers, Tugs, Pushboats | Montage and welding hulls and deck arrangement, all piping works in ships (tanks, machine rooms, accommodation), outfitting of : isolation (thermal and acoustic), all compartments (ceiling, bulkheads and floors) lining, accommodation equipment montage, wide – range painting works | Years 2001 to 2009 B.V. or MNF |
SOCARENAM Saint Malo | Yachts aluminium | Assembling and welding of aluminium hulls | 2009 B.V. |
CHANTIERS DE LA HAUTE SEINE Villeneuve-le-Roi | Ships fluvial, Barges | Repair and renovations of ships, montage and welding ships and barges hulls | Years 2001, 2003, 2005, 2006 B.V. |
S.A.E.N. PEINTURE Concarneau | Trawlers, merchant ships | Painting works | Years 2003 – 2008 |
ACE Etaples | Cruisers fluvial | Fitting and welding ships hulls | Years 2001, 2002 B.V. |
CONSTRUCTIONS MECANIQUES DE NORMANDIE Cherbourg | Yachts aluminum « Allures 44’ » Series, Yachts 60m 801,802, Military vessels “Baynunah” | Steel and aluminum hull works, all type piping systems fitting | Years 2006 – 2009 |